PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

3rd Floor interior metal framing Facing West.jpg Closed up the 2nd floor UCIA wall Facing East.jpg Compacting the Boiler-Electrical Room Facing West.jpg Erecting stone panels at the 2nd floor West Elevation.jpg h.k.jpg Monumental Stairs Facing South.jpg Resumed backfilling the 1st floor Electrical Room Facing South.jpg Constructing the parapet along the high roof South Elevation.jpg Continued installing sprinkler raiser at the 3rd floor Facing South.jpg